We have been sodding a number of areas along cart path edges utilizing the remaining sod budget for 2021.


#4 Green:

The existing cobblestones near the cart parking for #4 green were pulled up and removed and area prepped for sod.



















Completed work with sod installed.




















#7 Tee:

Worn out and weak turf along #7 path edge adjacent to the white tee was ripped up and removed using a sod cutter and shovels.


Area was then rototilled to help with compaction of area from cart/foot traffic. Loam was then added to the area and prepped for sod.


















Sod being rolled out and cut to fit the work area.



















#17 Tee:

The rocky depression along the cart path near #17 white tee was excavated and cleaned out before being rototilled and prepped for sod.



















Sod in the process of being installed. Area after finished sod work.























 
 