Winter 2021-2022: Sod along Path Edges 12/15
- matthewbehl
- Dec 16, 2021
- 1 min read
We have been sodding a number of areas along cart path edges utilizing the remaining sod budget for 2021.
#4 Green:
The existing cobblestones near the cart parking for #4 green were pulled up and removed and area prepped for sod.



Completed work with sod installed.
#7 Tee:
Worn out and weak turf along #7 path edge adjacent to the white tee was ripped up and removed using a sod cutter and shovels.

Area was then rototilled to help with compaction of area from cart/foot traffic. Loam was then added to the area and prepped for sod.


Sod being rolled out and cut to fit the work area.


#17 Tee:
The rocky depression along the cart path near #17 white tee was excavated and cleaned out before being rototilled and prepped for sod.


Sod in the process of being installed. Area after finished sod work.